Logo BIOSOIL. Home
Logo BIOSOIL Project. ENV/ES/000263
BIOSOIL Project
ENV/ES/000263


PROJECT "LIFE" TO DEMONSTRATE THE FEASIBILITY OF COMPOST BIOREMEDIATION TECHNOLOGY FOR THE RECLAMATION AND SUSTAINABLE URBAN MANAGEMENT OF BROWNFIELDS.


Menu of navigation

Contact data

 

INKOA SISTEMAS S.L.
C/ Ribera de Axpe, 11
Edificio D-1 Local 208
48950 Erandio (Bizkaia)
Spain
Tel: +34 902 998 367
Fax: +34 902 998 366

Tasks and results

Task Title Actions Deliverables

1

Evaluation and selection of potentially polluted brownfields.
Start Date: 11/2004
End Date: 02/2005
  • Recopilation of historical information on land uses and activities in potentially polluted brownfields in the Basque Country.
  • Pre-selection of 5 target brownfields.
  • Design of the Sampling Protocols.
  • Preliminary characterization of the brownfields.
  • Selection of 2 brownfields for the first-full scale demonstration experiences.

2

Characterization of the polluted brownfields.
Start Date: 03/2005
End Date: 05/2005
  • Collection of soil samples from the selected brownfields.
  • Physical, chemical, microbiological and toxicological characterization of soils.

3

Design of the first full-scale demonstration experiences.
Start Date: 06/2005
End Date: 09/2005
  • Evaluation of the distribution of available space in each brownfield for the installation of the prototype.
  • Design of the prototype.
  • Design of A and B field demonstration experiences.

4

Design and elaboration of specifically made composts rich in naturally present microorganisms.
Start Date: 07/2005
End Date: A - 11/2005B - 05/2006
  • Selection and formulation of the mixtures for composts elaboration.
  • Determination of the specific portion of the polluted soils to be added to the mixture.
  • Elaboration of the composts rich in degradative microorganisms.
  • Determination of compost/soil proportion.

5

Realization of "A" field experience (site polluted with simple organic compounds).
Start Date: 12/2005
End Date: 07/2006
  • Site preparation.
  • Prototype construction.
  • Preparation of the mixture of compost/soil.
  • Site bioremediation process.
  • Evaluation of the results and design optimisation.

6

Realization of "B" field experience (site with mixed pollution).
Start Date: 08/2006
End Date: 03/2007
  • Site preparation.
  • Prototype construction.
  • Preparation of the mixture of compost/soil.
  • Site bioremediation process.
  • Evaluation of the results.

7

Technical-economic feasibility study.
Start Date: 04/2007
End Date: 07/2007
  • Analysis of technical-economic feasibility.
  • Environmental cost-benefit analysis.
  • Comparative analysis between soil recuperation alternatives.
  • Study on the potential market.

8

Planning and sustainable use of the remediated sites.
Start Date: 06/2007
End Date: 08/2007
  • Design of an integrated strategy for the reuse of rehabilitated sites.
  • Contribution to sustainable development and planning in land-use redevelopment in urban areas.
  • Contribution to employment generation.
  • Contribution to the implementation, updating and development of local, regional and Community policy and environmental legislation.

9

Implementation of management and communication strategies.
Start Date: 11/2004
End Date: 10/2007
  • Definition of the management structure of the project.
  • Dissemination and communication strategies of the project.

10

Dissemination Plan.
Start Date: 11/2004
End Date: 10/2007
  • Definition of the management structure of the project.
  • Dissemination and communication strategies of the project.
  • Identification of the adressee groups and creation of a database.
  • Elaboration of dissemination and communication activities.
  • Organization of Dissemination activities.
  • Organization of Information activities.
  • Publications.